working on north roof
|
Roll 10 - 63
|
2nd floor PV is finished
|
2nd floor PV (note missing NP slates)
|
2nd floor North battens
|
prepping for eternit
|
Eternit over 2nd floor
|
installing north side 2nd floor
|
shingles and slates
|
belvedere
|
slate cutter on roof
|
moving PV slates to belvedere
|
wiring on belvedere
|
more slates!
|
installing PV on belvedere
|
belvedere (continued)
|
belvedere PV installation
|
PV fields from roof
|
2 down, 1 to go
|
2nd floor and belvedere
|
shingles and slates
|
shingles, waiting to install slates
|
roofing continues
|
Belvedere and 2nd floor PV
|
Battens for eternit slates
|
power lifting slates
|
garage solar slates on battens
|
copper trim
|
installing garage slates
|
Cutting slates
|